Blackdog Wear Aus
Account Wishlist Cart 0

  • Menu

  • Shop

  • Cart (0)

  • Account
  • Home
  • Leads
    • 0-1 Metre Leads
    • 1-2 Metre Leads
    • Over 2 Metre Leads
    • Stainless Steel Leads
  • Head Halters
    • Haltermate
    • Training Halters
  • Collars
    • Specialised Collars
    • Stainless Steel Collars
    • Standard Collars
    • Training Collars
  • Harnesses
    • Balance Harness
    • Dog Harness
    • Flyball Harness
    • Tracking Harness
  • Grooming
  • Treat Pouches
  • More Stuff...
    • Vests
    • Clickers
    • Connector Straps
    • Doggie Extras
    • Human Gear
    • K9 Sports Gear
    • New Stuff
    • ON SALE
  • Vests

Long Lead Range - 5 metre

  1. Leads
  2. Long Lead Range - 5 metre
Product main image

Long Lead Mini - 5m-Blue

Price:$33.30 Inc GST

Product Code: LLMini-Blu
Availability: In Stock
Write a review

size
Mini
Regular
Colour
Blue Blue
Red Red
Green Green
Pink Pink
Purple Purple
Orange Orange
Black Black

Packaging:

Supply without Packaging

Quantity:

Notify me when back in stock

Please tick this box to proceed.
  • Product Description
  • Video
  • Reviews (0)

Long Lead Range

Long Lead Regular and Mini - 5 Metres Long with snaphook and handle.

The ideal tool for training dogs and puppies for Recall,or allowing dogs to roam in the park, or the beach, while still maintaining lead control.

An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.

Enjoy the Blackdog Wear Regular and Mini Long Leads.

Sizes: Regular: 20mm wide webbing, Regular snaphook. Mini: 12mm wide webbing, Small snaphook.

 

***Please note - Tracking & Long Leads are our only leads that have different corresponding snaphook to the webbing size than all our other leads*****

 

(LL)

SKU LL
Shipping Weight 0.2600kg
Shipping Width 0.100m
Shipping Height 0.400m
Shipping Length 0.300m
Shipping Cubic 0.012000000m3

Be The First To Review This Product!

Help other Blackdog Wear Aus users shop smarter by writing reviews for products you have purchased.

Write a product review

Related Products

Balance Harness Range

Not yet rated

Balance Harness Range

From $39.90

Standard Collar Range

Not yet rated

Standard Collar Range

From $17.50

Standard Collar Range - Stainless Steel

Not yet rated

Standard Collar Range - Stainless Steel

From $20.30

Limited Slip Collar Range

Not yet rated

Limited Slip Collar Range

From $31.40

Training Collars Range

Not yet rated

Training Collars Range

From $23.50

Sign up for offers

Sign up for our newsletter to
receive exclusive offers and discounts!

We design and manufacture high quality training gear,all developed on science based training techniques and with the best welfare of our canine friends at heart

Information

  • Customers Testimonials
  • Bulk Ordering
  • About Black Dog
  • Find a Black Dog Stockist
  • Videos
  • News & FAQs

Customer Service

  • Shipping Charges Info
  • Order Processing and Delivery
  • Privacy Policy
  • Terms & Conditions
  • Guarantee
  • Returns

Account

  • Contact Us
  • My Account
  • Wholesale Registration
  • Order History
  • Wish List

Blackdog Wear Aus Pty Ltd- © Copyright 2026 Warning-Products have been tested on Animals! ...but probably don't contain Nuts.
ABN: 37 651 205 917
Address: PO BOX 241, LILYDALE VIC 3140

Terms & Conditions

Welcome to our website. If you continue to browse and use this website, you are agreeing to comply with and be bound by the following terms and conditions of use, which together with our privacy policy govern Blackdog Wear Aus’s relationship with you in relation to this website. If you disagree with any part of these terms and conditions, please do not use our website.

The term ‘Blackdog Wear Aus’ or ‘us’ or ‘we’ refers to the owner of the website whose registered office is 1/ 64 Cave Hill Road, LILYDALE VIC 3140. Our ABN is 37 651 205 917. The term ‘you’ refers to the user or viewer of our website.

The use of this website is subject to the following terms of use:

  • The content of the pages of this website is for your general information and use only. It is subject to change without notice.
  • Neither we nor any third parties provide any warranty or guarantee as to the accuracy, timeliness, performance, completeness or suitability of the information and materials found or offered on this website for any particular purpose. You acknowledge that such information and materials may contain inaccuracies or errors and we expressly exclude liability for any such inaccuracies or errors to the fullest extent permitted by law.
  • Your use of any information or materials on this website is entirely at your own risk, for which we shall not be liable. It shall be your own responsibility to ensure that any products, services or information available through this website meet your specific requirements.
  • This website contains material which is owned by or licensed to us. This material includes, but is not limited to, the design, layout, look, appearance and graphics. Reproduction is prohibited other than in accordance with the copyright notice, which forms part of these terms and conditions.
  • All trademarks reproduced in this website, which are not the property of, or licensed to the operator, are acknowledged on the website.
  • Unauthorised use of this website may give rise to a claim for damages and/or be a criminal offence.
  • From time to time, this website may also include links to other websites. These links are provided for your convenience to provide further information. They do not signify that we endorse the website(s). We have no responsibility for the content of the linked website(s).
  • Your use of this website and any dispute arising out of such use of the website is subject to the laws of Australia.
  • Wholesale customers need to ensure they are logged into their account to receive pricing, NO refunds will be given if you are not logged into your account. A credit may be considered but is the discretion of Blackdog Wear.

Privacy Policy

Privacy Policy - Blackdog Wear Aus Pty Ltd

- Melbourne Australia.

Blackdog Wear's reason for existance is to design and manufacture great products which improve the life/bond between Humans and Dogs, to do this we have decided to sell this gear, instead of give it away - this way we can afford to live and employ great people to help make Black Dog gear.

In order for us to send your purchased goods, collect payment, and communicate with you if anything in that process changes or needs to be clarified, we need to collect your contact and payment information.

Now for the official business end of this policy..

Privacy Policy

We are committed to providing quality services to you and this policy outlines our ongoing obligations to you in respect of how we manage your Personal Information.

We have adopted the Australian Privacy Principles (APPs) contained in the Privacy Act 1988 (Cth) (the Privacy Act). The NPPs govern the way in which we collect, use, disclose, store, secure and dispose of your Personal Information.

A copy of the Australian Privacy Principles may be obtained from the website of The Office of the Australian Information Commissioner at www.aoic.gov.au

What is Personal Information and why do we collect it?

Personal Information is information or an opinion that identifies an individual. Examples of Personal Information we collect include: names, addresses, email addresses, phone and facsimile numbers.

This Personal Information is obtained in many ways including correspondence by telephone and facsimile, by email, via our website www.blackdog.net.au from your website, from media and publications, from other publicly available sources, from cookies and from third parties. We don’t guarantee website links or policy of authorised third parties.

We collect your Personal Information for the primary purpose of providing our services to you, providing information to our clients and marketing. We may also use your Personal Information for secondary purposes closely related to the primary purpose, in circumstances where you would reasonably expect such use or disclosure. You may unsubscribe from our mailing/marketing lists at any time by contacting us in writing.

When we collect Personal Information we will, where appropriate and where possible, explain to you why we are collecting the information and how we plan to use it.

Sensitive Information

Sensitive information is defined in the Privacy Act to include information or opinion about such things as an individual's racial or ethnic origin, political opinions, membership of a political association, religious or philosophical beliefs, membership of a trade union or other professional body, criminal record or health information.

Sensitive information will be used by us only:

•           For the primary purpose for which it was obtained

•           For a secondary purpose that is directly related to the primary purpose

•           With your consent; or where required or authorised by law.

Third Parties

Where reasonable and practicable to do so, we will collect your Personal Information only from you. However, in some circumstances we may be provided with information by third parties. In such a case we will take reasonable steps to ensure that you are made aware of the information provided to us by the third party.

Disclosure of Personal Information

Your Personal Information may be disclosed in a number of circumstances including the following:

•           Third parties where you consent to the use or disclosure; and

•           Where required or authorised by law.

Security of Personal Information

Your Personal Information is stored in a manner that reasonably protects it from misuse and loss and from unauthorised access, modification or disclosure.

When your Personal Information is no longer needed for the purpose for which it was obtained, we will take reasonable steps to destroy or permanently de-identify your Personal Information. However, most of the Personal Information is or will be stored in client files which will be kept by us for a minimum of 7 years.

Access to your Personal Information

You may access the Personal Information we hold about you and to update and/or correct it, subject to certain exceptions. If you wish to access your Personal Information, please contact us in writing.

We will not charge any fee for your access request, but may charge an administrative fee for providing a copy of your Personal Information.

In order to protect your Personal Information we may require identification from you before releasing the requested information.

Maintaining the Quality of your Personal Information

It is an important to us that your Personal Information is up to date. We will take reasonable steps to make sure that your Personal Information is accurate, complete and up-to-date. If you find that the information we have is not up to date or is inaccurate, please advise us as soon as practicable so we can update our records and ensure we can continue to provide quality services to you.

Policy Updates

This Policy may change from time to time and is available on our website.

Privacy Policy Complaints and Enquiries

If you have any queries or complaints about our Privacy Policy please contact us at:

1/64 Cave Hill Road, LILYDALE VIC 3140

info@blackdogwear.com.au

03 9735 9371

 

Enter Quantity :